11 projects · perspective changes ordering; project facts remain the same.

Community research, maps and participatory interface
01 / Digital2018

The city of the sensitive community

A participatory urban archive connecting lived experience, a digital interface and a physical place for exchange.

Academic thesis · Civitanova Marche, Italy
Architecture, structure and MEP authoring screenshots
02 / BIM2018

One building. Multiple information systems.

Private residence and Galfa Tower exercises exploring architectural, structural and MEP modeling, exchange and coordination.

Academic BIM exercises · Milan, Italy
Timber and glass transport building within an urban context
03 / Architecture2018–2019

Architecture in collaborative practice

Selected architectural imagery from the professional collaboration documented in the supplied portfolio.

Professional collaboration · Paris, France
Exploded housing assembly, plans and technical sections
04 / Architecture2013

The diamond of sustainability

Social housing developed through environmental reasoning, collective space and a legible construction system.

Academic design proposal · Milan, Italy
Facade projections in Ascoli Piceno and Amandola
05 / Digital2015

Architecture as a moving surface

Two projection mapping studies turn architectural facades into time-based visual narratives.

Academic collaborative work · Ascoli Piceno & Amandola, Italy
Palazzo survey plans, sections and deterioration mapping
06 / Architecture2015

Transparent parasite

A heritage survey and intervention proposal connecting material diagnosis, access and a light courtyard roof.

Academic restoration proposal · Jesi, Italy
Nursery plans, earthbag wall assembly and construction sequence
07 / Architecture2014

Ubuntu: building around community

A nursery school concept organized around community, outdoor space and an earthbag construction sequence.

Academic thesis proposal · Damé, Côte d’Ivoire
Mixed-use construction axonometric and technical sections
08 / Architecture2015

Multidimensional fabric

A mixed-use study connecting a hotel, residences and museum through an articulated structural and spatial framework.

Academic design proposal · Rome, Italy
Mountain cabin plans, sections and construction axonometric
09 / Architecture2016

El Mirador

A mountain cabin study developed through topography, views and a precise section.

Academic design proposal · Panticosa, Spain
Landscape maps, planting calendar and topographic interventions
10 / Architecture2016

Reactivando un territorio

A landscape strategy connecting soil, planting, paths and small interventions along the Ebro.

Academic landscape proposal · Caspe, Spain
Residential modular analysis, plans and sectional axonometrics
11 / Architecture2012

Five House

A residential study exploring a sequence of volumes, movement and sectional relationships.

Academic design proposal · Plano, Illinois, USA